Open bids (1)

Proposed for fiscal 2027 (6 projects, $316,925)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $146,107. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Repave driveway and walkways
Paving, walkways & site
20 Sayles Street$19,230
Parking areas repaving
Paving, walkways & site
113-123 Columbia Street$24,035
Apartment electrical panel replacment
Electrical & generators · special award requested: $145,200
Columbia Valley$145,200
Driveway and parking area repaving
Paving, walkways & site
102-104 Columbia Street$29,222
Remove damaged fencing and replace with new
Paving, walkways & site
$10,000
ASHP Conversion
Heating, boilers & HVAC · special award requested: $89,238
102-104 Columbia Street$89,238

Proposed for fiscal 2028 (1 project, $200,167)

State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $146,107. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Siding replacement.
Siding, masonry & exterior
Columbia Valley$200,167

Proposed for fiscal 2029 (1 project, $144,716)

State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $146,107. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Kitchen Cabinet and Countertop Replacement
Kitchens & baths
Columbia Valley$144,716

Active projects (18)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
ARPA FF: Replace Exterior Doors
FISH 004071
Columbia Valley$81,349
AIP: 667 Routine Turnovers
FISH 004096
$12,800
Roll in shower unit 39
FISH 004058
Special Needs$39,871
VU2023: Unit Renovation-123 Columbia St
FISH 004073
113-123 Columbia Street$195,078
Remove and Replace Front Doors- 705-2
FISH 004076
113-123 Columbia Street$42,755
Heating System Upgrade
FISH 004082
9-11 North Hoosac Street$60,900
New Front Porch 113-123 Columbia
FISH 004089
113-123 Columbia Street$108,163
Vacant Unit Turnover
FISH 004092
Special Needs$233,742
SUST Grove St Boiler Replacement to ASHP
FISH 004093
3-1/2 Grove Street$243,982
Targeted Paving award 667-1 Sidewalk and Parking Lot Replacement
FISH 004094
Columbia Valley$58,450
Emergency Generator Community Room
FISH 004095
Columbia Valley$77,388
Install Intercom System
FISH 004097
Columbia Valley$152,078
Walkway/driveway replacement.
FISH 004098
Special Needs$7,350
Remove and replace porches and stairs
FISH 004099
9-11 North Hoosac Street$0
Laundry room flooring
FISH 004100
Special Needs$7,040
Mailbox cluster replacement - force account
FISH 004101
Columbia Valley$24,569
Roof and Siding Replacement
FISH 004102
20 Sayles Street$129,807
Replace Back Door Stairs - force account
FISH 004103
113-123 Columbia Street$22,770

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.