Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $136,063. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Exterior Unit and Storm Screen Door Replacement Windows & doors | 26 Garfield Street | $30,220 |
| Garage Siding, Doors, and Windows Windows & doors | Presidential Terrace | $92,221 |
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $136,063. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Kitchens (Bldgs 3-6) Kitchens & baths | Presidential Terrace | $130,680 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $136,063. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Kitchens (Bldgs 1-2) Kitchens & baths | Presidential Terrace | $65,340 |
| Kitchens (Bldgs. 11-14) Kitchens & baths | Presidential Terrace | $52,030 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Kitchens (Bldg 15-18) Kitchens & baths | Presidential Terrace | $204,365 |
| Kitchen (Bldgs 7-10) Kitchens & baths | Presidential Terrace | $244,484 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| AIP: 667 Routine Turnovers FISH 003074 | $12,000 | |
| Bathroom & Kitchen Shutoff-valve Replacement FISH 003060 | Presidential Terrace | $71,310 |
| ARPA Targeted Award - Fed Pac Panel & Fire Syst & Master Meter Gas to Elec. FISH 003064 | 26 Garfield Street | $1,155,337 |
| Water Heater Replacement(s) FISH 003067 | Presidential Terrace | $3,200 |
| Common Entry Flooring Replacement FISH 003068 | Presidential Terrace | $120,857 |
| Gas Furnace Replacement- 1 Building FISH 003071 | Presidential Terrace | $15,881 |
| Vacancy Turnover-Force Account FISH 003073 | Presidential Terrace | $9,775 |
| HILAPP: Rear Balcony Railing and Screen Replacement FISH 003075 | Presidential Terrace | $150,928 |
| HILAPP Intercom System 667-1 FISH 003076 | Presidential Terrace | $191,370 |
| Bathroom Renovations 167-1- Force Account FISH 003077 | 26 Garfield Street | $20,348 |
| TBD-DMH-set aside FISH 003078 | 26 Garfield Street | $6,485 |
| Vacancy Turnover FISH 003079 | Presidential Terrace | $32,831 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.