Plainbids · All housing authorities · Updated Sep 27, 2026

Acushnet Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Proposed for fiscal 2027 (2 projects, $122,441)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $136,063. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Exterior Unit and Storm Screen Door Replacement
Windows & doors
26 Garfield Street$30,220
Garage Siding, Doors, and Windows
Windows & doors
Presidential Terrace$92,221

Proposed for fiscal 2028 (1 project, $130,680)

State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $136,063. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Kitchens (Bldgs 3-6)
Kitchens & baths
Presidential Terrace$130,680

Proposed for fiscal 2029 (2 projects, $117,370)

State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $136,063. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Kitchens (Bldgs 1-2)
Kitchens & baths
Presidential Terrace$65,340
Kitchens (Bldgs. 11-14)
Kitchens & baths
Presidential Terrace$52,030

Further out: fiscal 2030–2031 (2 projects, $448,849)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.

ProjectDevelopmentTotal project cost
Kitchens (Bldg 15-18)
Kitchens & baths
Presidential Terrace$204,365
Kitchen (Bldgs 7-10)
Kitchens & baths
Presidential Terrace$244,484

Active projects (12)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
AIP: 667 Routine Turnovers
FISH 003074
$12,000
Bathroom & Kitchen Shutoff-valve Replacement
FISH 003060
Presidential Terrace$71,310
ARPA Targeted Award - Fed Pac Panel & Fire Syst & Master Meter Gas to Elec.
FISH 003064
26 Garfield Street$1,155,337
Water Heater Replacement(s)
FISH 003067
Presidential Terrace$3,200
Common Entry Flooring Replacement
FISH 003068
Presidential Terrace$120,857
Gas Furnace Replacement- 1 Building
FISH 003071
Presidential Terrace$15,881
Vacancy Turnover-Force Account
FISH 003073
Presidential Terrace$9,775
HILAPP: Rear Balcony Railing and Screen Replacement
FISH 003075
Presidential Terrace$150,928
HILAPP Intercom System 667-1
FISH 003076
Presidential Terrace$191,370
Bathroom Renovations 167-1- Force Account
FISH 003077
26 Garfield Street$20,348
TBD-DMH-set aside
FISH 003078
26 Garfield Street$6,485
Vacancy Turnover
FISH 003079
Presidential Terrace$32,831

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.