Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| ARPA FF: Comm Bldg ADA upgrades 667-1 & 667-2 SET ASIDE FISH 001060 · Accessibility (ADA) | Leavitt & Vinson (667-1 & 667-2) | $546,002 | 2026 |
| Flooring Replacement 667-2 FISH 001061 · Interiors, flooring & painting | Vinson Blanchard Gardens 667-02 | $34,214 | — |
| Low Flow Toilets SUST 667-1 FISH 001063 · Other | Leavitt Terrace 667-1 & Vinson Blanchard 667-2 | $49,126 | — |
| Crack Sealing & Line Striping FISH 001064 · Other | Leavitt Terrace & Vinson Blanchard | $8,500 | — |
| Waste Pipe Study 667-1 667-2 FISH 001068 · Water, sewer & plumbing | Leavitt Terrace & Vinson Blanchard (667-1 & 667-2) | $33,261 | 2026 |
| Tree Trimming & Landscape Upgrades FISH 001069 · Paving, walkways & site | Leavitt Terrace & Vinson Blanchard (667-1 & 667-2) | $25,401 | 2026 |
| Generator installation FISH 001070 · Electrical & generators | Leavitt Terrace 667-01 | $130,440 | 2026 |
| Maintenance Garage Roof (667-2) FISH 001071 · Roofing & gutters | Vinson Blanchard Gardens 667-02 | $9,660 | 2026 |
| Rear Deck Replacement - Dorsey FISH 001072 · Siding, masonry & exterior | Dorsey Street 705-1A | $9,740 | 2026 |
| SUST - Kitchen exhaust hoods 667-2 FISH 001073 · Heating, boilers & HVAC | Vinson Blanchard Gardens 667-02 | $621,500 | 2026–2027 |
| Window Replacement - CB FISH — · Windows & doors | Leavitt Terrace 667-01 | $74,705 | 2028 |
| Kitchen AFCIs - 667-2 FISH — · Kitchens & baths | Vinson Blanchard Gardens 667-02 | $36,886 | 2028 |
| Unit Flooring Replacement FISH — · Interiors, flooring & painting | Vinson Blanchard Gardens 667-02 | $30,250 | 2026 |
| Wall Heater Replacement 667-2 FISH — · Heating, boilers & HVAC | Vinson Blanchard Gardens 667-02 | $59,194 | 2029 |
| ADA Reasonable Accommodation TBD FISH — · Accessibility (ADA) | Vinson Blanchard Gardens 667-02 | $1,573 | 2027 |
| Kitchen countertop and sink replacement FISH — · Kitchens & baths | Leavitt Terrace 667-01 | $171,511 | 2029–2030 |
| Window Replacement FISH — · Windows & doors | Vinson Blanchard | $615,058 | 2026–2027 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.